Maps shared by the LBSEAWALLS resident committee (lbseawalls@gmail.com) for neighborhood reference. Not official City of Long Beach or NOAA guidance.
Seawall phases and severe defects
Shows Naples seawall Phases 1–6 (Phases 1 and 2 completed, Phase 3 awaiting Coastal Commission requirements, Phases 4–6, plus emergency tie-backs on Vista del Golfo) and severe-defect ratings.
Source: City of Long Beach / TetraTech Engineering Report (Nov 2024), mapped by LBSEAWALLS.
From the LBSEAWALLS committee: Canal users by ZIP code
Compiled by the LBSEAWALLS resident committee (lbseawalls@gmail.com), not by this site or the City. The committee plotted home ZIP codes from local boat rentals, swim groups, dragon boat teams, yacht clubs, and permittees to show the City of Long Beach that Alamitos Bay and canal users come from across Southern California and the US, supporting their case that seawall replacement should be funded publicly rather than by canal-front homeowners alone.
Source: LBSEAWALLS resident committee, October 13, 2026.
Page 1: breakdown by user groupPage 2: US distribution map